Tesla Powerwall 2 Arrives Just In Time As Power Cuts Worsen In South Africa
Credit to Author: Remeredzai Joseph Kuhudzai| Date: Tue, 17 Dec 2019 07:05:12 +0000
On the 9th of this month, for the first time ever, Eskom, South Africa’s national power utility company, implemented Stage 6 Load shedding in which Eskom had to shed a load of 6000 MW to stabilise the grid. South Africa’s current installed capacity is 49.4 GW, according to the Draft Integrated Recourse Plan (2018) from South Africa’s Department of Energy
Read more