Kairos Power Gets NRC Green Light for Second Molten Salt Nuclear Facility

Credit to Author: Sonal Patel| Date: Wed, 24 Jul 2024 17:25:44 +0000

The Nuclear Regulatory Commission (NRC) has wrapped up its final safety evaluation for Kairos Power’s Hermes 2 “low power” advanced test facility, comprising two 35-MWth test molten salt reactors—similar to […]

The post Kairos Power Gets NRC Green Light for Second Molten Salt Nuclear Facility appeared first on POWER Magazine.

Kairos Power will break ground on its Oak Ridge campus in Summer 2024, starting with the facilities for ETU 3.0 and the Hermes demonstration reactor. Courtesy: Kairos Power

Read more

Group Selected to Develop Pilot Nuclear Fusion Plant

Credit to Author: Darrell Proctor| Date: Wed, 10 Jul 2024 20:22:55 +0000

A global professional services and project management company headquartered in Montreal, Quebec, announced it has been chose to develop the pre-concept design for a nuclear fusion pilot plant (FPP). The […]

The post Group Selected to Develop Pilot Nuclear Fusion Plant appeared first on POWER Magazine.

Type-One-Energy

Read more

Fusion Energy Project Sited at Former TVA Coal-Fired Power Plant

Credit to Author: Darrell Proctor| Date: Sun, 25 Feb 2024 18:00:30 +0000

A major U.S. utility is part of a fusion energy project that would be located at the site of one of the company’s retired coal-fired power plants. Type One Energy […]

The post Fusion Energy Project Sited at Former TVA Coal-Fired Power Plant appeared first on POWER Magazine.

Type-One-Energy

Read more

NRC Completes Safety Review for Kairos Nuclear Test Reactor Within 18 Months

Credit to Author: Sonal Patel| Date: Thu, 22 Jun 2023 14:17:41 +0000

The Nuclear Regulatory Commission (NRC) has wrapped up a final safety evaluation for Kairos Power’s 35-MWth Hermes “non-power” demonstration reactor, which the firm has proposed to build at the East Tennessee […]

The post NRC Completes Safety Review for Kairos Nuclear Test Reactor Within 18 Months appeared first on POWER Magazine.

Read more

Pilot Advanced Nuclear Fuel Manufacturing Facility Opens

Credit to Author: Sonal Patel| Date: Thu, 25 Aug 2022 18:13:11 +0000

Ultra Safe Nuclear Corp. has opened a pilot fuel manufacturing facility that will produce TRi-structural ISOtropic (TRISO) coated fuel particles and the company’s proprietary fuel for use in its high-temperature gas reactor (HTGR). The Pilot Fuel Manufacturing (PFM) facility, located at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, is one of the […]

The post Pilot Advanced Nuclear Fuel Manufacturing Facility Opens appeared first on POWER Magazine.

Read more