LS Power Acquiring Renewable Energy Assets in $2.5 Billion Deal

Credit to Author: Darrell Proctor| Date: Fri, 09 Aug 2024 13:45:31 +0000

A New York-based power and energy infrastructure group will acquire more than 3 GW of operating renewable energy assets, along with another 8 GW of projects under development, from a […]

The post LS Power Acquiring Renewable Energy Assets in $2.5 Billion Deal appeared first on POWER Magazine.

Fig1-solar-wind-energy-storage-Shutterstock

Read more

LS Power Acquiring Renewable Energy Assets in $2.5. Billion Deal

Credit to Author: Darrell Proctor| Date: Fri, 09 Aug 2024 13:45:31 +0000

A New York-based power and energy infrastructure group will acquire more than 3 GW of operating renewable energy assets, along with another 8 GW of projects under development, from a […]

The post LS Power Acquiring Renewable Energy Assets in $2.5. Billion Deal appeared first on POWER Magazine.

Fig1-solar-wind-energy-storage-Shutterstock

Read more

New York Group Acquiring More Than 2.1 GW of Texas Gas-Fired Capacity

Credit to Author: Darrell Proctor| Date: Tue, 09 May 2023 00:44:33 +0000

New York-based energy investment firm LS Power on May 8 said it has reached an agreement with Brazos Electric Power Cooperative to acquire 2,145 MW of natural gas-fired power generation […]

The post New York Group Acquiring More Than 2.1 GW of Texas Gas-Fired Capacity appeared first on POWER Magazine.

Read more

PJM Stakeholders at Odds on Timing for Next Capacity Auction

Credit to Author: Sonal Patel| Date: Thu, 09 Jan 2020 15:19:42 +0000

The post PJM Stakeholders at Odds on Timing for Next Capacity Auction appeared first on POWER Magazine.

PJM Interconnection will not run a base residual auction (BRA) until the Federal Energy Regulatory Commission (FERC) approves recalculated Minimum Offer Price Rule (MOPR) floor prices for new and existing resources as directed by the federal entity’s ground-shaking Dec. 19 capacity market order. But when that will occur is still highly uncertain. In a presentation […]

The post PJM Stakeholders at Odds on Timing for Next Capacity Auction appeared first on POWER Magazine.

Read more