Trial Operation of Innovative Horizontal Pelton Hydropower Turbine Underway in Austria
Credit to Author: Sonal Patel| Date: Wed, 01 Mar 2023 05:15:00 +0000
A pioneering horizontal, six-nozzle Pelton turbine developed by Voith Hydro at the 326-GWh Gerlos 1 pumped storage facility in the Ziller Valley, Austria, is setting new benchmarks for the 140-year-old
The post Trial Operation of Innovative Horizontal Pelton Hydropower Turbine Underway in Austria appeared first on POWER Magazine.
Read more